Cavan Youth Training Centre - Project Profile
Project Info
- Provide BMS system fully integrated with other trades services for:
- HVAC control
- Energy Consumption Monitoring
- Water Consumption Monitoring (Mech Services, Domestic and Reclaimed)
- Alarm monitoring of Domestic water, Generator, Lift services, UPS System, Electrical DB Phase Failure.
- Trend logging
Main Requirements of Project
- BACnet/IP for Innotech data sharing over Cat 5e (structured network cabling).
- BACnet/IP integration to Clipsal CBus.
- BACnet MS/TP integration to ABB VSD (9) and Carrier Chillers (2).
- Modbus RTU interface to Fire Services and Multifunction Power Meters (18).
- Modbus TCP interface to UPS Units (12).
- Magellan-generated virtual point output to Security Services relay (low level).
- Generator and Transfer switch monitoring.
- Plant Scheduling for administration and accommodation facilities.
- Airflow monitoring and alarm from accommodation bedrooms (cells).
- Smoke-spill fan testing control and status monitoring.
- Chillers, Boilers and water-pumps staging.
- VAV and AHU Control with economy cycle.
- Constant Volume FCU control with economy cycle.
- HCV unit control (Evap cool/ Gas heat unit)
- Mitsubishi DX unit scheduling
- Dust Extraction Plant control (Woodwork shop)
- Swimming Pool space-heating and natural-ventilation louvre control.
- Data rooms DX unit control and High Temp alarm.
- CRAC unit rotation scheduling, status monitoring and High Temp alarm.
- Lift services general-alarm monitoring.
- Graphical mimic of Fire Information Panel (Magellan).
- Medical Gas supply alarm monitoring.
- Kitchen exhaust and supply air control and monitoring.
- Sally-port carbon monoxide level monitoring and exhaust fan control.
Features/Details
- Maxim III (NLD) (Qty 18)
- IDM4008 DI Expander (Qty 2)
- Minimax (MM01) (Qty 3)
- Minimax (MM02) (Qty 55)
- BACnet Gateway (IG03) (Qty 6)
- Subsystem Gateway (IG01) (Qty 8)
- VAVmax (VM01) (Qty 25)
- Contemporary Controls BASRT-B (BACnet MS/TP to IP router) (Qty 1)
- Loytec Linx 200 (Modbus RTU to BACnet/IP, and Modbus TCP to BACnet/IP) (Qty 2)
- iComm Communications Server (11 simultaneous TCP/IP connections plus BACnet connection)
- Magellan Explorer – 3D Graphical User Interface (BMS)
- Maxim Software
- Chronicle
Overview
- Large number of HLI from Innotech to other protocols and devices.
- Large volume of alarm monitoring from many trades: Electrical, mechanical, hydraulic, security, lift services, fire services and lighting control
- Long distances between out-buildings necessitated using BACnet/IP over third party structured network cabling for communications between Maxim controllers in different buildings, and with iComm.
The IG03 gateway has again been invaluable in seamless integration to the other services, ensuring all requirements of the client were met. The VAVmax controllers have impressed seasoned commissioning personnel and consultants alike, with the accuracy and precision of operation. And as usual the Max IIIs flexibility and cost-effectiveness has been beneficial to us enabling it to be used exclusively in all aspects of control and monitoring across the site.